top of page

IWMS West Macedonia (Greece)

Industrial
Automation

Solutions

Integrated Waste Management System for West Macedonia

 

Capacity: 120.000 t/y

Start of operation: June 2017

Client: Helector

 

 

Project: MBT Automation & SCADA System (MBT-OMS $ ISS SCADA System)

Design, development, planning, implementation, testing and commissioning of the Supervisory Automation Control and Data Acquisition system (SCADA system) for the Construction of Integrated Waste Management Centre in West Macedonia including:

  • Solid Waste Treatment Unit (MBT)

  • Sanitary Landfill Site

  • Waste Water Treatment Plant (WWTP)

 

MOTION Hellas offered the instrumentation design, software development, planning, implementation, testing and commissioning of the Supervisory Automation Control and Data Acquisition system (SCADA system) for the MBT Plant, the WWTP and the Landfill area.

 

All the MBT equipment is monitored by the MBT-OMS & ISS SCADA system. Except of the MBT and WWRP process equipment which includes the:

  • Reception & Process Crane

  • Mechanical Separation process

  • Biodrying process

  • Waste Water Treatment Equipment

the following MBT equipment is monitored by the MBT ISS Scada System (Building Services and Infrastructure):

  • Weighing Indicators

  • Fire Alarm system

  • Power Meters

  • Power Generators

  • Doors, matrix signs, message display, sensors (induction sensors, Optical distance sensor etc), Lighting Zones inside and outside the MBT buildings

  • Pumps, Tanks inside the MBT buildings, Sprinkler tank

  • Dust filters

  • Flare Equipment

  • Heating, Ventilation and Air Conditioning inside the MBT buildings (HVAC systems)

 

The MBT-OMS & ISS SCADA System aims to:

  • monitor and controls the operation of basic functions such as starting-up the installation, closing down the process, confirming emergency switch-off operations and restarting, etc.

  • supervises critical parameters, if this is not performed by means of locally installed systems

  • display the process on a flow diagram, especially:

  • warn against any approaching critical situations

  • disconnect and shut down in a safe manner parts of the installation in case of such critical situations

  • show and control the following information:

  • configuration of system and state of communications

  • current alarms, as well as list of previous alarms and events

  • instructions for rectifying errors in the facility

  • mimic diagrams

  • graphs

  • Management, i.e. activation and deactivation of the whole as well as particular parts of the facility.

  • documenting the operations of the installation including recording defects and any interferences with installation operating procedures.

 

In addition MOTION Hellas offered the development, planning, implementation, testing and commissioning of the WBManager System and the OPUS CMMS Software system.

 

bottom of page